How We Work

From First Enquiry To Loaded Container

The sequence, the day each step lands on, what you receive at the end of it and who owns it. The two windows that decide a launch — sampling and production — are the same ones we publish everywhere else on this site.

1 business dayTo acknowledge a complete brief
3–7 daysSampling after artwork approval
10–25 daysProduction after sample approval
500 pcsMinimum per colour on existing tooling

Order Flow

What Happens, In Order, And When

Read the last column if you are planning backwards from a launch date — it is the thing that lands in your inbox at the end of each step.
WhenStepWhat happensOwnerYou receive
Day 0Enquiry acknowledgedYou send the brief; we confirm receipt and name the person handling it.SalesReply inside one business day
Day 1Specification and quotationWe confirm the model, the body, the lid, the decoration and the packing, and price it as one configuration set.Sales + engineeringWritten quotation
Day 1-2Artwork check or mockupYour logo file is checked for resolution and colour count, and mocked onto the body so the placement is agreed before anything is made.DesignMockup image
Day 3-7Sample producedStock or decorated sample, charged at piece cost plus courier, with any new screen or Pantone match quoted as a separate line.Sampling workshopPhysical sample + photos
Day 5-10Sample approvedYou approve the sample, the colour chip and the print proof. The approved sample becomes the limit sample for the run.YouSigned approval / PO
-Order and deposit30% by T/T for a standard production run, with the balance against the bill-of-lading copy; tooling invoiced separately where new moulds are involved.Sales + financeProforma invoice
-Production scheduledThe slot is booked against the order, so the date quoted is the date planned against.PlanningProduction slot confirmation
-Material and in-process inspectionIncoming material verified, then in-process checks recorded through welding, evacuation and coating.QC + productionIn-process record
10-25 daysMass productionRuns from sample approval and cleared deposit. Part colours and mixed models are built to their own minimums.ProductionBatch records
-Pre-shipment inspectionAQL inspection against the limit sample, with photos and a written report issued before release.QC or third partyInspection report
-Loading and documentsLoading plan against the container, then commercial invoice, packing list, bill of lading, certificate of origin where applicable, and the test reports for your model.ShippingFull document set
-After arrivalA claim raised against a batch is traced to the production record rather than argued about, and the reorder runs to the same limit sample.Sales + QCTraceability check

Two clocks, and they are not the same one. The sampling window starts when the specification and the artwork are approved, and the production window starts when the sample is approved and the deposit has cleared. Anything that shortens those windows is a smaller change than anything that shortens the wait before they start.

Cost Structure

What Moves The Price, And What Does Not

We do not publish unit prices — every one of these lines moves with quantity, finish, packing and destination, and a list price would be wrong for almost every order it was applied to. What follows is the structure a quotation is built from, so the first conversation is about the levers rather than about a number.

01

Body and material

The largest single line. 304 (18/8) stainless is the default; a heavier wall or a 316 body moves it up, and the capacity drives the coil consumed per unit.

02

Structure and tooling

A double-wall vacuum body costs more to build than a single-wall one, and a new mould is a one-off charged separately and reused on the reorder.

03

Coating and plating

Powder coat, spray and metallising sit on different lines with different setup. A Pantone match, a gradient or a two-tone finish adds a maskset or a second pass.

04

Decoration

Silk screen is the cheapest per unit and the least flexible; laser needs no consumable but needs the machine time; embossing needs tooling. The artwork decides which of these is available.

05

Lid and accessories

A screw cap and a moulded carry-handle lid are not the same part. Much of the range shares one body, so the lid often moves the price more than the body does.

06

Packaging

A polybag and a retail colour box are different products. PDQ displays, mailer boxes and gift tubes are quoted against the dieline and the board.

07

Testing and documents

Food-contact and restricted-substance testing against a named standard is a per-model cost, not a per-order one; a third-party pre-shipment inspection is per order.

08

Freight and terms

FOB, CIF and DDP price the same goods differently, and on DDP the duty, import tax and clearance are separate lines rather than one landed figure.

Reserved

Unit-price comparison — reserved for later

This slot is held for an indicative price band per family, should we publish one. It is deliberately empty rather than filled with a placeholder: a price that is not a price is worse than no price at all, and any figure here would have to hold against the quotation for every configuration. Until then, ask for the quotation and we will price your configuration.

Request a quotation

Enquiry

Start At Day 0

Product type, quantity, decoration and destination are enough for us to come back with real numbers.

Start At Day 0

Product type, quantity, decoration and destination are enough for us to come back with real numbers.

Those five are enough to quote. Everything below is optional.