Body and material
The largest single line. 304 (18/8) stainless is the default; a heavier wall or a 316 body moves it up, and the capacity drives the coil consumed per unit.
OEM & ODM stainless steel drinkware from our own factory in Zhejiang — MOQ 500 pcs, samples in 3–7 days.
Get QuoteCost Guide
No unit prices are published on this site, on purpose — every line below moves with quantity, finish, packing and destination, and a list price would be wrong for almost every order it was applied to. What follows is the structure a quotation is built from, so the first conversation is about the levers.
The Structure
The largest single line. 304 (18/8) stainless is the default; a heavier wall or a 316 body moves it up, and the capacity drives the coil consumed per unit.
A double-wall vacuum body costs more to build than a single-wall one, and a new mould is a one-off charged separately and reused on the reorder.
Powder coat, spray and metallising sit on different lines with different setup. A Pantone match, a gradient or a two-tone finish adds a maskset or a second pass.
Silk screen is the cheapest per unit and the least flexible; laser needs no consumable but needs the machine time; embossing needs tooling. The artwork decides which of these is available.
A screw cap and a moulded carry-handle lid are not the same part. Much of the range shares one body, so the lid often moves the price more than the body does.
A polybag and a retail colour box are different products. PDQ displays, mailer boxes and gift tubes are quoted against the dieline and the board.
Food-contact and restricted-substance testing against a named standard is a per-model cost, not a per-order one; a third-party pre-shipment inspection is per order.
FOB, CIF and DDP price the same goods differently, and on DDP the duty, import tax and clearance are separate lines rather than one landed figure.
The Levers
| Line | Direction | Why | How buyers move it |
|---|---|---|---|
| Quantity | Down | The single largest lever on a per-unit cost, and the one buyers find hardest to move — a first order is a first order. | Ordering the whole programme in one colourway rather than splitting it across three. |
| Finish | Up | Powder coat to a two-tone split, or a metallic, adds a maskset or a second pass. | Keeping to one solid colour on the body, with the brand carried by the decoration. |
| Decoration method | Up | Screen print is the cheapest per unit and the least flexible; laser needs machine time and no consumable; embossing needs tooling. | Choosing the method to the artwork rather than the artwork to the method. |
| Lid | Up | Much of the range shares one body, so the lid frequently moves the price more than the body does. | Confirming the lid before the sample, not after. |
| Packaging | Up | A polybag and a printed retail box are different products; a PDQ or a gift tube is quoted against board and dieline. | Shipping in bulk cartons for e-commerce-only programmes that need no shelf display. |
| Tooling | One-off | A new mould or maskset is charged once and reused on the reorder — it is a cost of the programme, not of the unit. | Starting from a mould that exists; we name the closest one after the brief. |
| Testing | Per model | Food-contact and substances testing is per model and per market, not per order, so it does not repeat on a reorder. | Commissioning the right set once instead of guessing twice. |
| Freight and terms | Variable | FOB, CIF and DDP price the same goods differently, and on DDP duty, import tax and clearance are separate lines rather than one landed figure. | Comparing quotations on the same Incoterm before comparing totals. |
Commonly Believed
It lowers the per-unit share of the fixed lines — tooling, setup, testing. Past the point where those are covered, the marginal saving is the material and the run rate, which are already quoted.
It is a different body. Weight buys dent resistance and a thicker wall, and it also buys more steel per unit and a heavier carton, which is where a container hits its weight limit.
Only if the two quotations are for the same article, decoration, packing and Incoterm. A quotation that leaves out the retail carton is cheaper by exactly the carton.
A decorated sample is made by the production method, so it carries real setup. That setup is used again in the run, which is why it is a separate line rather than a hidden margin.
It is a rate against a volume and a weight, and both move with packing. Re-quoting the carton is often the cheapest way to move a landed cost.
Like For Like
Most "this supplier is cheaper" conclusions are a comparison of two different products. These six settle it before the totals are read.
Terms