| Incoming material | Steel coil and tube, lids, seals, coatings and inks. | Mill certificate against the ordered grade; wall thickness gauge; visual for handling damage. | Grade certificate filed per coil; gauge readings against the order. |
|---|
| Pre-treatment and cleaning | Degreasing and surface preparation before coating. | Bath concentration and temperature; visual water-break test on the treated surface. | Line log per shift. |
|---|
| Forming and welding | Tube cutting, forming and the seam or brazed joint. | Dimensional check against the drawing; weld integrity; burr and edge inspection. | Dimensional record per batch. |
|---|
| Evacuation | The vacuum in every body. | Each body evacuated and measured individually — not sampled. | Per-unit pass on the line; rejects recorded by cause. |
|---|
| Coating and decoration | Powder or spray coat, print, laser or transfer. | Film thickness; colour against the approved chip; adhesion cross-cut; print registration. | Adhesion coupons per batch; first-off print against the approved proof. |
|---|
| Assembly | Lid, gasket and accessory fitting. | Thread engagement; gasket seating; leak test by fill and inversion; function of any moving part. | Leak test sample per batch; assembly record per line. |
|---|
| Packing | Inner packing, master carton and marking. | Carton count and dimensions; drop and vibration on the packed carton; barcode scan; label placement. | Pack record per carton run; transit test report where the programme requires one. |
|---|
| Pre-shipment | The finished, packed lot. | AQL inspection against the agreed limit, plus a container loading check as cartons go in. | Inspection report with lot size, sample size and defects found. |