Food contact
Australia and New Zealand work to their own food-standards framework rather than the European one; Japan, Korea and most ASEAN markets publish national food-contact rules with their own test conditions and migration limits.
OEM & ODM stainless steel drinkware from our own factory in Zhejiang — MOQ 500 pcs, samples in 3–7 days.
Get QuoteSupplying Asia Pacific
Asia Pacific and Oceania combine the shortest sea lanes in the world with some of the most specific national standards — Australian and New Zealand requirements are written from a different food-safety framework to the European one, and most South-East Asian markets publish their own food-contact rules rather than adopting a bloc's. The upside is time: several of these destinations are days away rather than weeks.
Market Requirements
Australia and New Zealand work to their own food-standards framework rather than the European one; Japan, Korea and most ASEAN markets publish national food-contact rules with their own test conditions and migration limits.
National language panels are common — Japanese, Korean or a local ASEAN language — with country-of-origin and importer details specified separately by each market.
National lists rather than a single bloc list; several markets are closer to the European position than to the American one.
The shortest lanes of any region this site serves. To Australia and New Zealand it is roughly 2–3 weeks; to Japan and Korea 3–7 days.
Australian and Japanese retail groups specify packaging and display requirements in detail, and e-commerce-only programmes often need no retail display at all.
Starting Points
Shipping
| Ports | Ningbo or Shanghai, FOB; CIF to Sydney, Melbourne, Auckland, Yokohama or Busan on request. |
|---|---|
| Transit | Roughly 3–7 days to Japan and Korea, 1–2 weeks to South-East Asia, 2–3 weeks to Australia and New Zealand, plus the production window. |
| Cartons | The standard family pack-outs, with a retailer-specific display unit added where a programme lists into physical stores. |
| Advantage | The short lane means a reorder is a realistic response to a season rather than a next-year decision, which is worth building into the first order's tooling and colour choices. |
Questions From This Market
Yes, but they are not European rules and the test is not interchangeable. Tell us the destination at the enquiry stage and the applicable set is confirmed before anything is commissioned.
On a Japanese or Korean lane the sea leg is days rather than weeks, so the binding constraint becomes production and the artwork round, not shipping. Keeping colour and decoration stable between runs is what makes that speed real.
The importer normally owns the approved label content, and we print the panel to your artwork. Multi-language and small-panel layouts are confirmed against the carton before printing.
No. 500 pieces per colour on existing tooling, the same everywhere. What differs is the transit, and therefore how a smaller first order and a reorder can be sequenced.
Also Relevant
Enquiry