Where To Cut Cost Without Cutting The Product
Almost every cost reduction that works removes a setup. Almost every one that fails removes material. Here is how to tell them apart before you order.
Read articleOEM & ODM stainless steel drinkware from our own factory in Zhejiang — MOQ 500 pcs, samples in 3–7 days.
Get QuoteBlog
Practical writing for people who buy, specify or import drinkware — materials, tooling, compliance and lead times. Grouped by the decision you are actually making.
Browse
Finding the factory, and deciding whether it is the right one.
21 articles
Steel, forming, tooling, and what happens on the line.
15 articles
Colour, finish, logo and packaging — and the limits of each.
12 articles
Inspection, documents, and the standards a buyer is held to.
12 articles
Minimums, lead time, Incoterms and the money behind a quotation.
23 articles
All 48 articles, newest first, unfiltered.
Browse the full archiveOrdering, Cost & Strategy
Almost every cost reduction that works removes a setup. Almost every one that fails removes material. Here is how to tell them apart before you order.
Read article
Twelve questions whose answers tell you more than a catalogue does — including the ones most buyers think of too late.
Read article
Promotional orders are bought on a date, not on a specification. What that changes about the product and the plan.
Read article
A request for quotation is a specification with a question attached. The six fields that turn a vague enquiry into a price.
Read article
The Incoterm decides where your cost ends and your risk begins. What each one covers for a drinkware order.
Read article
Most importing problems are specification problems wearing a logistics costume. The order of operations that avoids them.
Read article
The pack is the salesperson when nobody is standing next to the shelf. What to decide, and the two numbers it changes downstream.
Read article
Lead time is a chain of windows, not a number. Here is how to build a delivery date you can promise your own customer.
Read article
Packaging decides the carton, the carton decides the container, and the container decides the freight. Four routes, and what each one changes.
Read articleBy Region
FDA food contact, Proposition 65 and a retail carton that survives a DC.
Read the US & Canada pageLFGB, REACH and a packaging regime that is getting stricter every year.
Read the EU & UK pageConformity schemes, extreme heat, and a supply chain that rewards planning.
Read the Gulf & Africa pageShort transit, local standards, and the markets that most resemble our own.
Read the APAC & Oceania page